Format B · Guided walkthrough

One step at a time

The same four phases, but only the step you are on. Nothing to scroll past, nothing to lose your place in. Come back whenever you like and it opens where you left off.

Want to see everything at once? Switch to the progress tracker

Phase 1 of 4 — Preparing your application

Saved on this device only — we can’t see it.

  1. Phase 1 0 of 7 Preparing your application
  2. Phase 2 0 of 8 Preparing for the build
  3. Phase 3 0 of 7 Rebuilding your home
  4. Phase 4 0 of 3 Final steps

Your current step

Every step is listed below, phase by phase

Stepping through them one at a time, and saving what you have done, both need JavaScript. Everything is still here to read in order, and the progress tracker groups the same steps by phase.

Phase 1 · Preparing your application Step 1 of 7

Who can apply

Portal status: Pre-application

The scheme is open to homeowners in Donegal, Mayo, Clare, Limerick and Sligo. You must live in the home, or own one RTB-registered rental property that was registered by 1 November 2021. You do not need anything in hand to start reading.

Documents needed

Tips

  • Take clear photos and log when you first noticed the damage
  • Save every file in one dedicated folder

Not started

Phase 1 · Preparing your application Step 2 of 7

You notice cracks

Portal status: Observation stage

Record what you can see — stepped cracking, dampness, doors and windows that have started to stick. You are not diagnosing anything at this stage, only building a record. Damage usually worsens over winter, so a log over time is far more persuasive than a single photograph.

Documents needed

Tips

  • Let your phone stamp the date — do not rely on memory
  • Repeat the same angles every few months

Not started

Phase 1 · Preparing your application Step 3 of 7

Get professional advice (BCA)

Portal status: BCA required

Arrange a Building Condition Assessment with a registered engineer, architect, surveyor or building surveyor. This is the document the whole application rests on, so ask what the report will and will not cover before you engage anyone.

Documents needed

Tips

  • Ask other homeowners locally who they used
  • Keep copies of every report and invoice
  • Get the fee in writing before work starts

Not started

Phase 1 · Preparing your application Step 4 of 7

Your application

Portal status: Application submitted

Upload the BCA and your supporting documents through the Donegal DCB portal. Two of the required certificates come from Revenue and catch people out — both are obtained through Revenue MyAccount and both can take a few days to issue.

Documents needed

Tips

  • Screenshot every submission and confirmation email
  • Request the Revenue certificates a fortnight early
  • Save the reference number somewhere you will find it again

Not started

Phase 1 · Preparing your application Step 5 of 7

Your application is reviewed

Portal status: Under review

The council verifies your documents and forwards the application to the Housing Agency. This stage can be slow and quiet. Silence is normal; it does not mean anything has gone wrong.

Documents needed

Tips

  • Keep copies of every communication in both directions
  • Note the date and name for any phone call, then confirm it by email

Not started

Phase 1 · Preparing your application Step 6 of 7

Understanding your assessment

Portal status: Assessment stage

The Housing Agency decides whether your home meets the damage threshold and which remediation option applies — full demolition and rebuild, rebuilding the external walls, or re-rendering the affected walls. The option sets the grant, so this is the point to go through the figures with your engineer line by line.

Documents needed

Tips

  • Ask your professional to explain the options and the grant amounts
  • Work out the shortfall before you accept anything

Not started

Phase 1 · Preparing your application Step 7 of 7

Your next decision, or an appeal

Portal status: Decision pending

Accept the remediation recommendation, or appeal it using the Schedule 15 Notice of Appeal — the standard form for challenging a scheme decision. There is a fixed window, so do not wait to see whether things improve.

Documents needed

Tips

  • Make copies of everything you submit
  • Send it by recorded post and keep the receipt
  • Diary the deadline the day the decision arrives

Not started

Phase 2 · Preparing for the build Step 1 of 8

Approval to proceed

Portal status: Decision accepted

Accept the remediation option and the grant. Planning and preparatory work can begin now — but do not start any building work yet.

Documents needed

Tips

  • Keep screenshots and emails

Not started

Phase 2 · Preparing for the build Step 2 of 8

Preparation stage

Portal status: Preparation stage

Prepare plans, quotes and energy checks. Wait for the portal to prompt you before commencing works.

Documents needed

Tips

  • Organise every document in one folder

Not started

Phase 2 · Preparing for the build Step 3 of 8

Confirm your building professional

Portal status: Professional confirmation required

Confirm the registered architect, engineer or surveyor who will prepare your remedial works plan.

Documents needed

Tips

  • Check their experience with defective concrete blocks specifically

Not started

Phase 2 · Preparing for the build Step 4 of 8

Remedial works plan

Portal status: Plan preparation

Your professional prepares the plan setting out the scope and sequence of the work.

Documents needed

Tips

  • Keep copies for reference and for tracking costs later

Not started

Phase 2 · Preparing for the build Step 5 of 8

Planning permission check

Portal status: Planning assessment

Confirm whether planning permission is required for your home.

Documents needed

Not started

Phase 2 · Preparing for the build Step 6 of 8

BER / energy assessment

Portal status: BER / energy assessment

An energy assessment may be required for building control compliance.

Documents needed

Tips

  • Only schedule the assessment when you are instructed to

Not started

Phase 2 · Preparing for the build Step 7 of 8

SEAI grants (optional)

Portal status: Energy grants considered

You may be eligible for SEAI energy grants alongside the rebuild.

Documents needed

Not started

Phase 2 · Preparing for the build Step 8 of 8

Quotes and cost planning

Portal status: Costing in progress

Collect contractor quotes and review the costs and the timeline together.

Documents needed

Tips

  • Keep copies for submission and for comparison

Not started

Phase 3 · Rebuilding your home Step 1 of 7

Remedial works plan submission

Portal status: Plan submitted

Submit the remedial works plan and supporting documents through the portal.

Documents needed

Tips

  • Keep screenshots of every portal submission

Not started

Phase 3 · Rebuilding your home Step 2 of 7

Commencement notices

Portal status: Pre-commencement

Submit notices to the DCB Scheme (7–14 days before you start) and to Building Control (14–28 days before).

Documents needed

Tips

  • Diary both windows the moment you have a start date

Not started

Phase 3 · Rebuilding your home Step 3 of 7

Time limits

Portal status: Timeframe awareness

Works must be completed within 130 weeks — about two and a half years. The final grant claim must be submitted within 65 weeks of the works starting.

Tips

  • Track both deadlines with a calendar or portal reminders

Not started

Phase 3 · Rebuilding your home Step 4 of 7

Approval to start works

Portal status: Approved to commence

Receive formal grant approval and confirm your start date.

Documents needed

Not started

Phase 3 · Rebuilding your home Step 5 of 7

If issues arise later

Portal status: Further information request

The council may come back with a request for further information or clarification.

Tips

  • Respond promptly and keep copies of all correspondence

Not started

Phase 3 · Rebuilding your home Step 6 of 7

Keeping records

Portal status: Works underway

Keep every invoice, receipt and photograph, and log anything the builders find on site.

Tips

  • Photograph the work at each stage, not just at the end

Not started

Phase 3 · Rebuilding your home Step 7 of 7

Payment claims

Portal status: Claim in progress

Submit stage payment claims as the works reach each agreed milestone, with the invoices and evidence that support them.

Documents needed

Tips

  • Claim as each stage completes rather than saving them all up

Not started

Phase 4 · Final steps Step 1 of 3

Inspections before the final claim

Portal status: Inspection stage

Attend the inspections and note any corrections that are required before you can claim.

Tips

  • Ask for anything raised on site to be confirmed in writing

Not started

Phase 4 · Final steps Step 2 of 3

Final grant claim

Portal status: Final claim submitted

Submit the final grant claim with the full set of invoices, certificates and completion evidence. This must be within 65 weeks of the works starting.

Documents needed

Tips

  • Check the 65-week deadline before you begin assembling the claim

Not started

Phase 4 · Final steps Step 3 of 3

Final status

Portal status: Complete

Check the portal for completion, and keep every record safely. You may need them again.

Tips

  • Keep the whole folder — do not throw anything out once it is signed off

Not started

Jump to any step

You do not have to go in order. Completed steps show in green.

Phase 1 · Preparing your application

Phase 2 · Preparing for the build

Phase 3 · Rebuilding your home

Phase 4 · Final steps