The same four phases, but only the step you are on. Nothing to scroll past, nothing to lose your place in. Come back whenever you like and it opens where you left off.
Stepping through them one at a time, and saving what you have done, both need JavaScript. Everything is still here to read in order, and the progress tracker groups the same steps by phase.
Phase 1 · Preparing your applicationStep 1 of 7
01
Who can apply
Portal status: Pre-application
The scheme is open to homeowners in Donegal, Mayo, Clare, Limerick and Sligo. You must live in the home, or own one RTB-registered rental property that was registered by 1 November 2021. You do not need anything in hand to start reading.
Documents needed
Tips
Take clear photos and log when you first noticed the damage
Record what you can see — stepped cracking, dampness, doors and windows that have started to stick. You are not diagnosing anything at this stage, only building a record. Damage usually worsens over winter, so a log over time is far more persuasive than a single photograph.
Documents needed
Tips
Let your phone stamp the date — do not rely on memory
Repeat the same angles every few months
Not started
Phase 1 · Preparing your applicationStep 3 of 7
03
Get professional advice (BCA)
Portal status: BCA required
Arrange a Building Condition Assessment with a registered engineer, architect, surveyor or building surveyor. This is the document the whole application rests on, so ask what the report will and will not cover before you engage anyone.
Upload the BCA and your supporting documents through the Donegal DCB portal. Two of the required certificates come from Revenue and catch people out — both are obtained through Revenue MyAccount and both can take a few days to issue.
Documents needed
Tips
Screenshot every submission and confirmation email
Request the Revenue certificates a fortnight early
Save the reference number somewhere you will find it again
Not started
Phase 1 · Preparing your applicationStep 5 of 7
05
Your application is reviewed
Portal status: Under review
The council verifies your documents and forwards the application to the Housing Agency. This stage can be slow and quiet. Silence is normal; it does not mean anything has gone wrong.
Documents needed
Tips
Keep copies of every communication in both directions
Note the date and name for any phone call, then confirm it by email
Not started
Phase 1 · Preparing your applicationStep 6 of 7
06
Understanding your assessment
Portal status: Assessment stage
The Housing Agency decides whether your home meets the damage threshold and which remediation option applies — full demolition and rebuild, rebuilding the external walls, or re-rendering the affected walls. The option sets the grant, so this is the point to go through the figures with your engineer line by line.
Documents needed
Tips
Ask your professional to explain the options and the grant amounts
Accept the remediation recommendation, or appeal it using the Schedule 15 Notice of Appeal — the standard form for challenging a scheme decision. There is a fixed window, so do not wait to see whether things improve.